All posts by andrew.dakers@blueyonder.co.uk

Cabe’s opaque Design Review for Brentford Town Centre is best binned

When Cabe, now part of the Design Council, first published their latest Design Review for Brentford Waterside, Hounslow on 14 February 2013 local residents were hopeful that this once respected body would urge Ballymore and their architects to radically reconsider the density and architectural aesthetic of their scheme.  Instead residents, including many town planning and architecture professionals, were astounded by a majority of Cabe’s conclusionsOur investigations since have not lessened our concerns.  Instead they highlight the urgent need for close scrutiny of the way Cabe undertakes future Design Reviews if they are to ever live up totheir own standards.

Our analysis of the Cabe Design Review which follows, first looks at its fatal flaws in terms of complying with Cabe’s own principles and then considers the review’s conclusions.  Given the flaws in application of principles, the Design Review’s conclusions can be given little credence.

Process flaws

Cabe’s Design Review guidance sets out ten principles that their reviews are supposed to follow. These were in development at the time of the Brentford Design Review, and I understand from correspondence and a meeting with Design Council Chief Executive John Mathers that they are now being rolled out for all future Design Review commissions, which is to be welcomed.  The charity’s trustees should back him in this endeavor.  However the table below shows the gap between theory and practice is stark in the Brentford Design Review, which can no longer be given any airtime and credence by local, regional and national planning authorities.

Design Review principle Score (3 max  – 0 minimum) Commentary
Proportionate – It is used on projects whose significance, either at local or national level, warrants the investment needed to provide the service. 3 A scheme with this scale of impact in a historic town center clearly warrants careful application of the Design Review process.
Timely – It takes place as early as possible in the design process, because this can avoid a great deal of wasted time. It also costs less to make changes at an early stage. 3 Cabe have already conducted a pre-application Design Review in about 2006.  This was not published but is largely understood to have been scathing of pre-application drawings commissioned by Ballymore from BDP.
Advisory – A design review panel does not make decisions, but it offers impartial advice for the people who do. 0 ‘Advisory’ status of findings is understood but impartiality as noted below is impossible to confirm.
Objective – It appraises schemes according to reasoned, objective criteria rather than the stylistic tastes of individual panel members 0 Impossible to judge as we know neither the criteria used nor the individual panel members.

Given Cabe has not yet gone on the record and published a full account of this Design Review we can only assume that the process was fully funded by Ballymore and therefore partial.

Accessible – Its findings and advice are clearly expressed in terms that design teams, decision makers and clients can all understand and make use of. 2 See analysis below of findings and advice.
Independent – It is conducted by people who are unconnected with the scheme’s promoters and decision makers, and it ensures that conflicts of interest do not arise. 0 We have no idea as to whether the panel’s membership was independent given the membership has not been published.  We have simply been told that the panel is made up of people drawn from a pool of 250+ experts.

This does raise serious questions as to if and when the body will learn frommistakes of the past that clearly contributed to the departure of a previous Chief Executive.

 

Expert – It is carried out by suitably trained people who are experienced in design and know how to criticise constructively. Review is usually most respected where it is carried out by professional peers of the project designers, because their standing and expertise will be acknowledged. 0 We have no idea as to whether the panel was an appropriate and respected group of experts given the panel’s membership has not been published.  We have simply been told that it is made up of people drawn from a pool of 250+ experts.
Multidisciplinary – It combines the different perspectives of architects, urban designers, urban and rural planners, landscape architects, engineers and other specialist experts to provide a complete, rounded assessment. 0 We have no idea as to whether the panel’s membership was multidisciplinary give the panel’s membership has not been published.  We have simply been told that it is made up of people drawn from a pool of 250+ experts.
Accountable – The Review Panel and its advice must be clearly seen to work for the benefit of the public. This should be ingrained within the panel’s terms of reference. 0 We have no idea as neither the panel’s membership nor terms of reference have not been published.
Transparent – The panel’s remit, membership, governance processes and funding should always be in the public domain. 0 If this guidance was followed, Cabe would have published on their website for the Brentford Design Review the following:

• Objective criteria

• Panel terms of reference/ remit

• Panel membership

• Governance processes

• Funding

 

Confusion remains as to what was reviewed by the Cabe panel.  Ballymore advised BHSSG representatives that their draft revised drawings had been viewed by the panel.  The Design Council’s Chief Executive thought they had reviewed the planning application drawings (unrevised).

 

What are the findings and advice from this opaque process?

Cabe: “We are delighted to review this important project; it presents a great opportunity to regenerate Brentford High Street and the land between the high street and the Great Union Canal. We welcome the proposal and applaud the client for their commitment to design quality. We commend the thoughtful analysis which has informed the scheme.”

Response: Brentford’s local community was not at all convinced by the appropriateness of the design at a public meeting last Autumn where BHSSG was invited to contribute.  In fact all residents present at the meeting spoke out against the current designs, which have ignored the atmosphere and design aesthetic that residents explained to Ballymore and their architects at numerous design workshops in 2011/12.

“The new quarter sits comfortably in the historic context and has the potential to become a successful addition of Brentford. While the density is high and the proposed finger block typology requires great care to avoid overlooking and privacy issues, we think that phase 1 illustrates how this challenge can be resolved successfully. Equal design care needs to be applied to future stages of the proposal to achieve an acceptable outcome in the round. We have a few comments to make regarding the detailed resolution of the site layout and the building blocks.”

The density is well in excess of planning guidance with a scale that will drown out what is retained of the area’s heritage assets.

“Masterplan and site layout – The proposed masterplan works well within the historic setting and provides a street pattern that has the potential to draw people in and to create a vibrant waterfront destination.”

We broadly support the proposed street pattern, although it is unfortunate that it obliterates one of Brentford’s oldest yards – Boar’s Head Yard, visible on the 1635 Moses Glover map.

“In our view, the scheme has a strong identity based on the careful integration of historic elements, and we think that the height and volume of the proposed perimeter blocks appear appropriate in this context.”

Only in a few aspects does the proposed new build compliment the historic elements.  The height and volume is largely completely insensitive to the historic elements which will be dwarfed by what is proposed.  The proposed heights exceed the Brentford Area Action Plan (Local Development Framework) which highlighted four stories as the character of the area.

“The success of the scheme and the regeneration of the existing high street will depend on how the two areas can complement each other and also on the offer of shops, cafés and activities which need to reflect the specific identities of the high street and the waterfront.”

We would agree.

“We applaud the joined-up thinking around the Magistrates Court and the decision to create a unified public space around the building.”

So do we, but this is outside the redline of Ballymore’s proposed development.  Aspects of the Ballymore scheme that relate to Market Place still do little to respond to the scale of the space.

“The east-west route parallel to the canal and the high street has the potential to become a thriving place with shops and active frontages; the local authority should request a detailed landscape strategy in terms of the paving materials and the relationship with the water, for example, and condition the landscape design as appropriate to ensure that the intended quality will be delivered. We also recommend assessing the impact of low and high tide on the landscape proposal. We feel that the presence of water, which makes this location special, could be strengthened across the site.

We would agree.

“A different articulation of Still Yard, for example, perhaps less narrow or aligned with Half Acre, would help connect the waterfront to the wider Brentford neighbourhood as this axis could link directly to the railway station and the local library.”

This statement evidences how little the Design Panel understands Brentford a place whose character is defined by quirky, narrow, non-aligned alleyways and yards.

“Building design – While we commend the overall articulation of the finger blocks, we feel that the taller elements could be even taller and somewhat more elegant – provided they do not impact more on the views from Syon Park and Kew Gardens.

We understand this observation is based on a guidance Cabe produced on tall buildings with English Heritage, although it ignores the reality of the scheme context: Opposite a World Heritage Site (Kew Gardens) and Grade 1 listed Syon House and gardens, the advice takes leave of any common sense.

“At the western end of the site, the scheme integrates the church and existing trees and creates a new public space. The eastern side, however, appears less successful: if designed by less experienced hands the multi-story car park could become an uninspiring building facing the blank walls of the existing supermarket; this is unfortunate given the prominent location at the entrance to the high street and Brentford.”

We would agree.

“The density of the proposal and the complexity of the courtyard blocks require great design skills which are apparent in the current proposal. To ensure that the delivered scheme will match the original design intentions, we urge the local authority to condition the elevational treatment and materials.”

We would agree.

“Phase 1- We welcome the richness of the proposal and the fact that a number of skilled architects have worked together to create a homogenous, new piece of Brentford. We think that the proposal has the potential to become a vibrant place to live.”

We welcome the mix of architects but hoped for designs that were less bland and homogenous and respected the local vernacular.  We believe the scheme has a long way to go before it offers the potential for a vibrant place to live.

“Given that the presentation to the Cabe panel did not illustrate the various residential typologies, we urge the local authority to ensure themselves that the blocks provide decent floor plans with a minimum of single aspect flats and that overlooking and privacy issues are avoided as well as overshadowing and overheating problems.

We would agree.

“Finally, sufficient soil needs to be provided above the car parking to allow trees to grow.”

We would agree.

The Cabe Design Review guidance (pg 6) states: “Design Review… gives decision makers the confidence and information to support innovative, high quality designs that meet the needs of their communities…”.  The Brentford community expressed its needs through the Community Vision for Brentford High Street (2007) and the Brentford Area Action Plan (2009).  From our experience of being at the receiving end of this Cabe Design Review, the organisation still has a long distance to travel in advocating “designs that meet the needs of their communities”.  We wish their new Chief Executive luck in this journey and strongly advise planning officials to put this flawed, opaque study in a bin where it belongs.

Andrew Dakers writes this blog posting in his capacity as Chair of Brentford High Street Steering Group, the local regeneration charity.  His analysis of the wider failings in Ballymore’s planning process can be read here.

Brentford High Street – Achieving regeneration of beauty and a human scale

As many of you will know, the regeneration of Brentford High Street, has been a cause close to my heart for many years.  As a local councillor I convened the start-up of Brentford High Street Steering Group (BHSSG) in 2006 with cross-party support and I remain chair. In 2007 I spent a year facilitating the community participation that led to the Community Vision report for the high street, subsequently recognised in the annual awards of the Academy for Sustainable Communities.  Many aspects of the Community Vision were reflected in the Brentford Area Action Plan (local planning policy) published in 2009 – and then the Prince’s Foundation for the Built Environment report in 2010.

We have always been – and remain – constructive critics, and sometimes critical friends/partners, of the developers Ballymore.  With our dialogue based approach it was therefore with a heavy heart, feeling that some of our substantial concerns and ideas have not reached Ballymore’s management and investors that we have raised the volume on our critique of the scheme in recent months.  From our website, this was picked up by BrentfordTW8.comThe Hounslow Chronicle and now The Irish Times.

This blog endeavours to set out in some detail what BHSSG feels is to be commended, and where substantial improvements are still required…

Where the current Ballymore team are to be commended

Sadly the predecessors of the current Ballymore team in London cleared out many small businesses from the south side of the High Street in 2005-7 leaving dereliction in their wake.  This created a challenging base for the current team to start building relations with the community.

However since 2007 we would credit Ballymore’s project managers with ensuring that most of the spaces that had not been wrecked were reoccupied.  The company has:

  • supported initiatives such as the town’s Christmas lights and community art initiatives;
  • worked in partnership with volunteers and micro-enterprises on “meanwhile uses”, which has prevented Brentford High Street’s collapse through the recession;
  • co-commissioning the Prince’s Foundation for the Built Environment report in 2010 with Brentford High Street Steering Group; and
  • when London Borough of Hounslow looked to bid for Outer London Fund Round 2 funding from the Mayor of London and needed a delivery partner, Ballymore gamely stepped up to the table and offered to help.  (Developers ISIS eventually secured the project management brief but the tangible support of Ballymore must be welcomed).

We now have to look to the future.  Getting meanwhile usage right does not negate the need to implement the community’s vision for the regeneration.  As explained below, the planning approach has left too much in the hands of architects that do not demonstrate a deep enough empathy with the area – and been selective in what aspects of the community’s vision they incorporate.

Where the planning application falls short – too tall and ugly

In the coming days we will publish an updated version of our Regeneration Scorecard.  This looks at the present scheme alongside the goals of the 2007, 2009 and 2010 policy/guidelines.

We welcome the fact that the scheme has the potential to respond to a number of environmental sustainability issues, restore quite a few historic buildings and inject new vitality into Brentford’s retail offer.   I can vouch having visited Ballymore’s Embassy Gardens scheme that their ability to deliver high quality interiors and living spaces is impressive. On a two dimensional level there is also plenty that links the proposed street scape to the community vision – although the yard retaining Brentford’s oldest yard name (Boar’s Head Yard) is notable by its absence from the Planning Application, which is a very unfortunate loss.  Where the scheme seems to have gone adrift was when it went into 3D.

BHSSG has said for many years that the community should be involved in selecting the scheme architects.  We have also always said that the massing should respect the spirit and intent of the Brentford Area Action Plan (BAAP).

Ballymore have long stated that they could not involve the community in the choice of architect as it is a very important process for them and they needed to ensure that the selected team were able to deliver the quality that Ballymore require.  BHSSG share this desire for a quality build so we remain baffled as to why we could not have been involved in the long listing and short listing.  Community involvement in the selection of architects for ISIS’ Commerce Rd site shows the difference in collective ownership this can make.

BHSSG have tried to help the planning process reach a successful conclusion by arguing consistently for three styles of architecture to be blended across what is a substantial site: restoration of old buildings, modernism and also traditional styles in the new build.  The latter would help ensure the retention – and sometimes creation – of the “nooks and crannies” that give the area its character and charm, rather than an overwhelming amount of angular modern architecture that drowns out the historic buildings.   This approach would blend the old with the new.

We have clearly failed to make the case thus far for securing this third strand of traditional styles as part of the mix – some sadly call it pastiche in a derogatory way.  As others have argued, traditional styles “can be used confidently as symbols of continuity in our changing lives… The C20th modernists have used modernism to portray amnesia for the past and a break with any tradition.”

The need for deep community participation in design

This gap between the Community Vision and planning application reflects the reality that Ballymore and their architects have not yet embraced the “Community architecture” approach that we argue is necessary in our historic town centre.  This can simply be defined as, “architecture carried out with the active participation of the end-users”.   If their architects were asked clearly by Ballymore as the commissioners to embrace community architecture they would have let go of the modernism in some areas of the site.  This would ensure some architecture of a traditional style and respond to the full spectrum of architectural styles and characters the community envisioned.

Community architecture can be traced back to the 1950s self-help community initiatives in developing countries.  In these self-help projects, the professionals joined hands with the people to improve their environment.  It has now developed in different forms around the world with a common vision, that is, public participation in decisions affecting their environments and lives.  The Conservative’s in the UK published a green paper prior to the 2010 general election on the future of planning that talked of an “Open Source planning” approach, perhaps in a similar spirit?  If we look to the way that a traditional style was incorporated into the Kew Bridge side of the St Georges Kew Bridge scheme we can see community influence in practice.

BHSSG have always said “consultation” without genuine “participation” was insufficient for such a critical site to Brentford’s history and future.   In this vein we requested that BHSSG/ the community needed to have key site reports released iteratively to comment on – not all at the point of planning application as eventually occurred. We now have to spend our weekends, against a ticking clock, trawling through and scrutinising environmental sustainabilityretaileconomic and dozens of other reports that should have been discussed much earlier in the design process.  Perhaps most critically the Design Code and Design Approach should have secured the support of the local community 12 months ago, before the architects launched into the detailed design phase.

After giving our time in 2007 to visit a selection of London sites that excited Ballymore, we even offered to take Ballymore and their architects this Autumn to visit sites that we thought should be used as references.  Both these offers over the past year, early feedback on site reports and reference site visits,  have sadly been ignored.

Iterative improvements are not enough

Over the past 12 months we have given considerable amounts of time to the consultation process as volunteers sitting on a ‘Reference Group’.  The Statement of Community Involvement (SCI) shows the piecemeal responses from Ballymore to our substantive concerns regarding architecture and massing.

When the final planning application was submitted in September 2012 (of which the SCI is a part) it became absolutely clear that fundamental issues we are raising of massing and architectural aesthetic had been ignored – or that for some reason the Ballymore project team do not have the room for manoeuvre needed to secure the full support of the community.   With more realistic ambitions from their investors about Return on Investment (ROI) and therefore massing – as well as a shift in design approach – we would not be at this impasse. If the land has been over-valued then losses should be accepted sooner rather than later.  However it may be that ROI can be maximised through higher quality housing of reduced density – each unit may sell at a higher price point.

As someone that has personally experienced growing delays in the wait times to see a local GP as Brentford’s population has grown sharply – and seen friends struggling to get their kids into the local primary and secondary schools of their choice – 930 flats (the massing) is a real, not an abstract, concern.

Ballymore and community stakeholders are now faced with a dilemma as to whether there is value in continuing to try and achieve iterative improvements to the plans that are presently on the table.

Next steps – achieving a world-class scheme

We have continued to input to the process in recent weeks and months, despite our significant misgivings, to try and improve the scheme. Within the limited scope of Ballymore’s present readiness for change to the plans we do not want to be unhelpful.  Whilst Ballymore may be frustrated at a brighter spotlight than ever now falling on the scheme, sustained dialogue is clearly more important than ever.  Neither Ballymore nor the local community want delays or additional costs to be incurred in the scheme securing planning permission and proceeding.

We strongly believe a world class scheme can be put together that meets all stakeholders needs, but there needs to be a shift on these fundamentals.  Brentford’s town centre regeneration is a risk shared by Ballymore, their backers and the local community – whether planning permission can be secured and the development succeeds or fails will affect all our investments in Brentford.

Andrew Dakers writes this blog post in his capacity as Chair of Brentford High Street Steering Group.

Work experience and internships: an extended charter?

As I reflected in a blog post last Thursday the idea that left me least convinced in the Prime Minister’s speech to the BITC summit was the assertion that: “Put a young person into college for a month’s learning, unpaid – and it’s hailed as a good thing. Put a young person into a supermarket for a month’s learning, unpaid – and it’s slammed as slave labour.”

I pointed out that surely when Tescos, Argos and Poundland are reflecting on the concerns about the race to the bottom that these “workfare” schemes could trigger it is time for Number 10 to take note. Tescos particularly suggest in their statement that the “risk of losing benefits that currently exists should be removed”. The debate on Thursday’s Newsnight programme made clear that it is this mandatory element that is of most concern to employers. It has been further examined by Channel 4 New’s fact check team.

Principles that might underpin an extended Work Experience/ Internships Charter
These schemes raise a wider range of issues that need consideration. I would suggest the Government, and all those involved in Work Experience, should revisit and extend The Internship Charter developed by CIPD. Factors to consider are:
Pay and expenses: The deflationary pressure on wages and paid work opportunities that unpaid labour may create needs careful consideration. Unpaid work experience for a week or two at Key Stage 4 (KS4) and Key stage 5 (KS5) seems reasonable, but post-18 work experience placements/ internships should surely at least secure the minimum wage. Given participants in the DWP Work Experience programme are expected to work for 25-30 hrs/ week for JSA of £53.45 (under 25) and expenses, this equates to an hourly wage of approx £1.78-£2.13. Perhaps the Government should reduce the number of hours a week of mandatory work to 9hrs (on basis of 21+ minimum wage of £6.08). This would ensure job seekers can compliment their work experience with training hours and time to job hunt.
Qualification level of participants and genuine skills development: DWP should make an explicit commitment to focus on work experience and internships that are a close match to the qualification level of the individual concerned, if they are going to pursue a strategy of compulsion. It would seem reasonable to expect someone that needs work experience on their CV or to get in/ stay in the habit of work to undertake a placement that demands their skills level, or one rung down the ladder. Simply put, having a graduate with a masters spending weeks stacking shelves at Sainsbury’s is unlike to help them or society very much.
Access/ open recruitment: Deputy Prime Minister’s call for “access to internships [to be] open and transparent, with financial support such as providing expenses or accommodation, or by treating the internship as a job that can be paid under National Minimum Wage law” has clear moral foundations. This philosophy needs to guide Government/ DWP and businesses’ policies. They should sign up to CIPD’s charter.
Core or supplementary activity: Careful consideration should be given by businesses and non-profits as to whether they are asking people on placement to do work that would usually be carried out by a member of paid staff (i.e. are they using an intern to provide free/ cheap maternity cover) or are they doing work that is additional to ‘steady state’ activity? The former should at least attract a minimum wage salary, but should also be calibrated to the demands and responsibility of the placement. Supplementary development activity that would not happen due to financial resources constraints in an organisation (commercial or non-commercial), without the involvement of a work experience trainee/ intern, might be justified in being categorised as an unpaid volunteer position.
Organisation type: Small charities and start-ups probably have a stronger moral case than more established and financially liquid organisations for not paying people doing work experience. The money may simply not be there and the placements are essentially highly supported volunteer roles. However there may be a moral case for the organisations’ giving volunteers first option on appropriate job opportunities as and when they emerge, perhaps using a ‘deferred progression agreement’ model.
Too much work experience? At what point should employability professionals advise that people have enough work experience at different organisations on their CV and need to simply focus on job applications and interview skills? This needs careful reflection.
Progression agreements: Businesses and non-profits that are recruiting at the skills level of those undertaking work experience placements should commit to interviewing these people first for new openings. The Government or business support organisations could support this approach by putting template progression agreements in the public domain. These agreements would formalise this commitment when someone starts a placement.

Andrew Dakers is Business Development Director at Hounslow Education Business Partnership, which delivers 3000 work experience placements with partner companies each year, and former Head of Public Affairs at Business in the Community. He writes this blog in a personal capacity.